Changuara/Chirodzo (Bernado Corneiro)
< Changuara
Back to the Hydropower Sites Database
General Information
| Country: | Mozambique |
|---|---|
| City/Town: | Messica, Changuara/Chirodzo, Manica |
| Coordinates (Powerhouse): | |
| Year of Commission: | |
| Basin Name: | |
| Stream Name: | Messica |
| Developer: | |
| Operator: | Bernado Corneiro |
| Project Status: | |
| Any other uses of the water source: | to be assessed - owner works at Ifloma |
| Contact: | |
| Comment: | |
| Link to Photos: |
Technical Information
| Power: (kW) | 6 |
|---|---|
| Energy (kWh/a): | |
| Capacity Factor (%): | |
| Penstock Diameter (mm): | |
| Penstock Length (m): | |
| Penstock Material (m³/s): | |
| Maximum Flow of the Penstock (m³/s): | |
| Minimum Flow of the Stream (m³/s): | |
| Head (m): | |
| Turbine Type: | |
| Turbine Manufacturer: | |
| Generator Type: | |
| Generator Capacity (kW): | |
| Generator Manufacturer: | |
| Comment: |
Mini/Island Grid Information
| Mini Grid: | Yes |
|---|---|
| Load Control Information: | |
| Connection Type: | |
| Public Lighting: | |
| Length of Transmission Line (m): | |
| Voltage (v): | |
| Transmission Conductor (type) : | |
| Diameter of Conductor (mm²): | |
| Transformer Rating (kVA): | |
| Link to Grid: | |
| S.W.E.R: | |
| Operational Period (Xdays/year): | |
| Comment: |
Dam Information
|
Dam Type: |
|
|---|---|
| Dam Construction Material: | |
| Dam Height [m]: | |
| Length of Dam [m]: | |
| Storage Volume of Reservoir (m³): | |
| Flood Storage of Reservoir: | |
| Channel Material: | |
| Comment: |
Economic Information
| Cost (€): | |
|---|---|
| Donor/Financier & Percentage: | |
| Tariff Levels: | |
| Connected Households: | |
| Connection Cost (€): | |
| Cost to be Covered by Households (%): | |
| Comment: | |
| Link to Cost Breakdown: |