I would like to order the variable "test" by the largest OR.
structure(list(test = c("a", "b", "c", "d", "e", "f", "g"), OR = c(2.78,
1.74, 1.32, 1.16, 0.92, 0.75, 0.53), LowerLimit = c(2.11, 0.96,
1.11, 0.74, 0.61, 0.52, 0.4), UpperLimit = c(3.72, 3.25, 1.58,
1.85, 1.4, 1.09, 0.71), Group = 1:7), class = "data.frame", row.names = c(NA,
-7L)
p = ggplot(data=table,
aes(x = reorder (test, -OR), y = OR, ymin = LowerLimit, ymax = UpperLimit )) +
geom_pointrange(aes(col=test), size = 1.5)+
geom_hline(aes(fill=test), yintercept =1, linetype=2)+
xlab('test')+
ylab("Odd's Ratio (95% Confidence Interval)")+
geom_errorbar(aes(ymin=LowerLimit, ymax=UpperLimit,col=test),width=0.5,cex=1)+
facet_wrap(~test,strip.position="left",nrow=9,scales = "free_y") +
theme(plot.title=element_text(size=16,face="bold"),
axis.text.y=element_blank(),
axis.ticks.y=element_blank(),
axis.text.x=element_text(face="bold"),
axis.title=element_text(size=12,face="bold"),
strip.text.y = element_text(hjust=0,vjust = 1,angle=180,face="bold"))+
coord_flip()
p
I have reviewed this post Order Bars in ggplot2 bar graph
I have tried the reorder command and also the example of creating a "positions" list and neither work.

